Clearly show the size and location of the lot, show Electrical Utility Property Line Box, or Point of Entry in reference to the Main Electrical Service Room, and location of additional Electric Room(s) that contains large equipment (1000 kVA or larger).įloor Plan. Provide a drawing sheet index to assist with navigation. Should clearly describe the project location, using a site/plot plan, and provide necessary drawing notes. Drawings and specifications necessary to convey essential information such as general notes, floor plans, elevations, and details.Īll submissions for electrical plan review, for service equipment totaling 1000KVA or more or above 1000Volts, shall include the following plans/drawings:
Building electrical installation design code#
There must be close coordination between all disciplines for proposed scope of work to ensure code compliance.Įlectrical Required Documents.

Complete Submission of Electrical Plan Review DrawingsĮlectrical drawings should represent complete scope of work, including multiple disciplines such as but not limited to architectural, electrical, and fire alarm power.

Drawings shall clearly indicate existing site conditions and proposed conditions affected by the scope of work. The DOB guidelines outlined, provide an organized approach for the preparation of Electrical Drawings to facilitate the plan review process. The information provided on the drawings and/or manufacturer specifications must clearly describe all of the work required for the code compliant execution and completion of the project.
Building electrical installation design professional#
Prior to preparing the electrical drawings, the Registered Design Professional must perform a pre-design review that analyzes all of the existing site conditions and other components affected by the proposed scope of work. Grounding Electrode ConductorīC Chapter 27 Emergency/Standby Power Systems Project Guidelinesġ RCNY 4000-01(a)(1) – List of electrical installation types that require filingġ RCNY 4000-01(b)(1) – Filing Requirementsġ RCNY 4000-01(b)(1)(i) – Filing Method and Applicantġ RCNY 4000-01(b)(1)(ii) – Filing Fee and Payment Methodġ RCNY 4000-01(b)(1)(iii)(A) to (S) – Requirements For Plans and Drawing Guidelines for Submission of Electrical Systems Project Plans Service Overcurrent Protective Device Coordination Service Entrance Conductors and Busbar Ampacity Spaces about Electrical Equipment over 1,000V, Nominal Spaces about Electrical Equipment 600V, Nominal/ Less NOTE: While the followings is a list of key zoning, code and other regulations that may be relevant in the project design, it does not cover ALL applicable regulations.Īpproval of Electrical Materials, Equipment and Installations

In addition, all work under the project must conform to the NYC Construction Codes, such as the Administrative Code, Building Code, Energy Conservation Code, Fuel Gas Code, Mechanical Code and Plumbing Code.ĭepending on the location of work being performed, you may also need to comply with other city agencies requirements, such as but not limited to the Fire Department (FDNY), Department of Environmental Protection (DEP), Department of Transportation (DOT), and Landmark Preservation Commission (LPC).Įlectrical work that requires submission of electrical plans for review and approval by DOB, shall comply with the following code and regulations that apply.

Design Professional Requirements: Electrical Systems Applicability of CodeĮlectrical work, new installation or modifications to existing systems, must comply with the 2011 NYC Electrical Code, which includes both administrative requirements and the 2008 NEC amendments (NFPA 70).